Web-mail
Login
Toggle navigation
HOME
COMPANY
Introduction
The history of MIRAE-EN Co.,Ltd.
Organization
Contact Us
WORK & INT.STANDARDS
Radioactive Waste Management
Maintenance
Nuclear I&C Engineering
International Standardization Act.
Government Project
CGID
Verification and Validation
Reliability
ACADEMIC PAPERS
BLOGS
PRODUCTS
PATENTS & CERTI
BLOGS
BLOGS
BLOGS
HOME
BLOGS
5/15/2017 ~ 5/18/2017, …participated in ISO TC85 SC5 WG5 meeting of “waste characteristics and management” in Philadelphia, USA.
In this meeting, MIRAE-EN Co. Ltd. has presented the topics below for standardization.
The process requirements for Low level waste management life cycle
The guidance for Waste tracking system (WTS)
The guidance for Waste Certification Program (WCP)
Those topics will be circulated through internet for standardization in near future.
글 번호
:
22
Admin
02/10/2017~02/17/2017 UAE Barakah NPP inspection (elec/I&C)
02/10/2017~02/17/2017 UAE Barakah NPP inspection (elec/I&C)
글 번호
:
21
Admin
12/16/2016~12/23/2016 UAE Barakah NPP inspection (elec/I&C)
12/16/2016~12/23/2016 UAE Barakah NPP inspection (elec/I&C)
글 번호
:
20
Admin
Completed the construction of quality assurance system by establishing WCP(Waste Certification Program) / WTS (Waste Tracking System) operation plan
On December 19, 2016, we has completed the project titled as“construction of quality assurance system by establishing WCP(WasteCertification Program) / WTS (Waste Tracking System) operation plan” with thesupport of KNF(KEPCO Nuclear Fuel Company) successfully.
The requirements for WCP and WTS was established, and the aspects ofrisk-based QA for managing the radioactive waste also were or…
글 번호
:
19
Admin
Completed the operating environment analysis and system redesign of Cyclotron
On November 30, 2016, we has finished the operation environment analysis and system redesign(I&C, mechanic and electric) of Cyclotron located in Jeongeup, KAERI.Through this, the optimization and design enhancement of Cyclotron could be implemented in order to respond to the operation needs and changes in operation.
글 번호
:
18
Admin
«
11
12
13
14
15
»
subject
제목
내용
작성자 아이디
작성자 이름
×
비밀번호